Public-source review through 17 September 2026

UnknownOperating facilitiesReported
580Built / operating capacityMW · reported
6Active pipeline recordsrecords
1,530Announced / campus capacityMW · verified
360Physical power allocationMW · verified
0Under constructionMW · verified

Read a zero carefully. It means no qualifying public numeric claim currently meets that field's definition. It does not mean the market has zero capacity.

Projects by latest verified stage

The furthest stage supported by the reviewed evidence.

Announced / planned
1
Land secured
0
Approved
1
Under construction
4
Energized
0

Next publicly unresolved evidence gate

Unresolved means not publicly verified. It does not mean rejected or absent.

Land / site control
2
Investment / planning approval
0
Physical power allocation / grid path
0
Energization / RFS
4
Operational confirmation / operational MW
0

Active project view

What the public evidence currently supports

The private register contains the evidence IDs, source links and field-level caveats.

ProjectOperator / developerLatest verified stageNext publicly unresolved gateTarget RFSLast material confirmation
JC3Princeton Digital GroupUnder constructionEnergization / RFSUnknown17 September 2026
JC4Princeton Digital GroupUnder constructionEnergization / RFSUnknown17 September 2026
Kabil Industrial Tech Park campusDayOneApprovedLand / site controlUnknown17 September 2026
NeutraDC Nxera Batam campusNeutraDC / NxeraUnder constructionEnergization / RFSUnknown17 September 2026
BW Digital NDP1BW DigitalUnder constructionEnergization / RFS31 December 202517 September 2026
Digital Edge CGK CampusDigital Edge IndonesiaAnnounced / plannedLand / site controlUnknown28 January 2026

Detailed research