Southeast Asia monitor · Thailand
Thailand data-centre market
The existing operating base and active development pipeline are shown separately.
Public-source review through 17 September 2026
Read a zero carefully. It means no qualifying public numeric claim currently meets that field's definition. It does not mean the market has zero capacity.
Projects by latest verified stage
The furthest stage supported by the reviewed evidence.
Next publicly unresolved evidence gate
Unresolved means not publicly verified. It does not mean rejected or absent.
Active project view
What the public evidence currently supports
The private register contains the evidence IDs, source links and field-level caveats.
| Project | Operator / developer | Latest verified stage | Next publicly unresolved gate | Target RFS | Last material confirmation |
|---|---|---|---|---|---|
| Haoyang Rayong hyperscale campus | Beijing Haoyang Cloud & Data Technology | Approved | Physical power allocation / grid path | 31 December 2026 | 17 September 2026 |
| Chonburi Tech Park CTP1 | DayOne | Under construction | Energization / RFS | 31 December 2026 | 17 September 2026 |
| TH1 | Empyrion Digital | Approved | Land / site control | 31 December 2026 | 17 September 2026 |
| GSA Data Center 02 | GSA Data Center 02 Co. | Approved | Land / site control | Unknown | 17 September 2026 |
| DAMAC Digital Thailand project | DAMAC Digital | Approved | Land / site control | Unknown | 17 September 2026 |
| Unnamed local-investor hyperscale project | Undisclosed local investor | Approved | Land / site control | Unknown | 17 September 2026 |
| Telehouse Bangkok expansion | Telehouse / KDDI | Approved | Land / site control | Unknown | 17 September 2026 |
| Vistas Technology / ZDATA second Thailand project | Vistas Technology / ZDATA Technologies | Approved | Land / site control | Unknown | 17 September 2026 |
| Digital Edge / B.Grimm BKK Campus | Digital Edge / B.Grimm Power | Announced / planned | Land / site control | Unknown | 6 May 2026 |
| NTT Bangkok 4 Campus | NTT Global Data Centers | Under construction | Energization / RFS | Unknown | 14 July 2026 |
| True IDC three-project BOI programme | True Internet Data Center | Approved | Land / site control | Unknown | 16 January 2026 |
| GSA Data Center 05 two-project BOI programme | GSA Data Center 05 Co., Ltd. | Approved | Land / site control | Unknown | 16 January 2026 |
| Stellar DC Bangkok BOI-approved project | Stellar DC Co., Ltd. | Approved | Land / site control | Unknown | 16 January 2026 |
| Freyr Technology Thailand data-hosting programme | Freyr Technology (Thailand) Co., Ltd. | Approved | Land / site control | Unknown | 16 January 2026 |
Detailed research
Need the source trail?